Bathroom vanity was finally fixed into place with the plumbing installed
Replaced the faucet since the other one had so much corrosion it was not salvageable. |
Notice the Hepvo drain/trap to save space |
Placed the upper bathroom cabinet in...still have not decided on light fixtures. |
Finalizing the finish on the resurfaced vanity |
I absolutely LOVE the pink! I have an entire set of pink sink, toilet, and shower pan. One of theses days the right project will come along...
ReplyDelete